![]() |
NGUYỄN Đức
Vương Date of birth : 22nd Aug. 1978 Place of birth : Thanh Thuy - Phu Tho – VIETNAM Nationality
:
Vietnamese Sex : male Marital status: Married Mobile : 84. (0)9 04 125 685 Email : vuongbri@gmail.com |
EDUCATIONS University of Transport and Communications, Hanoi, Vietnam MSc. 2007 Thesis: “Research on stayed-cable installation technology in cable-stayed bridges” Practice course 2006 Attended the training course of Technology Transfer Program about management, repairing, strengthening of bridge and other transport projects, ASIA-Link Corp. in Ho Chi Minh University of Technology. Practice course 2004 Attended the training course of Technology Transfer Program for Hai Van Tunnel Project Dipl. Eng 2001 Thesis: “ Design a cable-stayed bridge cross an existing river” Thesis: “ Design a cable-stayed bridge cross an existing river” ACADEMIC AWARDS Ministry of Education and Training, Vietnam Mechanics Organization, Student Organization offered: • First prize of Material Strength, National Mechanics Olympiad 2000 • Second prize of Hydraulics Mechanics, , National Mechanics Olympiad 2000 University of Transport and Communications offered: • Compliment for good student 1999 – 2000 • Compliment for good student 2000 – 2001 TEACHING EXPERIENCE University of Transport and Communications, Hanoi, Vietnam Lecturer 2004-Present “Bridge Structural Analysis”, “Bridge Construction” Developed
syllabus and overall course structure, training and technology
transfer for student “Apply MIDAS/Civil in bridge modeling and analysis” Teaching
Assistant
2001 – 2003 Transport Engineering Design Incorporation, Hanoi Moderator 2004 – present Editing, checking, managing for the field of Bridge construction, Informatics in Civil Engineering, Structural Modelling and Analysis, Structural Analysis Programming Structural Analyst 2003 - 2004 • Local analysis for main bridge: cross beam, anchorage areas, mast foot, piers • General analysis for pedestrian tunnel Design Check for Thuan Phuoc suspension bridge project, Danang city Design Check for Rao II bridge project, Binh cable-stayed bridge, Hai Phong city As a designer for Bridge Projects: Van Don Bridge, Ngoc Thap Bridge, Muong La Bridge Design Team Manager for Cam Luong Bridge, Hanh Phuc Bridge, Canh Nang Bridge…. Design and Load Testing for Binh cable-stayed bridge, Bai Chay cable-stayed bridge …. PUBLICATIONS AND PAPERS 1. “Introducing design sequence, tunneling construction, advantages, disadvantages and the field of application of New Austrian Tunneling Method”, Transport and Communication Science Journal, Volume 5, November 2003. 2. “Design technology of sunk tunnel and its application in Viet Nam”, The Viet Nam Bridge and Road Journal, Volume 5, May 2004. 3. “Bridge structure modeling and analysis with MIDAS/Civil”, The Publishing House Construction, 2005 4. “Strengthening serviceability of reinforced concrete bridge by bonding steel plate technology”, The Viet Nam Bridge and Road Journal, Volume 4, April 2007. 5. “Transportation engineering structure analysis”, The Publishing House Construction, 2007 6. “Calculation stayed-cable force of strand by strand installation technology”, The Viet Nam Bridge and Road Journal, Volume 9, September 2007. LANGUAGES • Vietnamese - native language • English - speak fluently and read/write with high proficiency |
This site was last updated 11/25/07